move Materials from one Project directly to the next

Good morning, 

 

I´m trying something new here. The Idea is to move the Materials, that are planed and reserved for one project to another project, that is planed directly after the first one.

Do you have an idea how to plan the right Material for the second job, so no problem happens when nothing arrives in the warehouse ?

thanks in advance

David Suchodoll

1

Comments

4 comments
  • We duplicate the first project and then have the planning period of the first one end at the exact start of the second. Then we just move the entire 2nd project to location in the warehouse.

    1
    Comment actions Permalink
  • Thank you for your comment Ciaran. I agree with your answer and have a little addition.


    Just to make sure we are on the same page: There are two challenges here.

    One is how to plan the same equipment. The only way to do this is as Ciaran suggested to duplicate the project and have the planning period of the first one end at the exact start of the second.

    The second issue is how to book back equipment to the warehouse that actually does not return to the warehouse and book the equipment out when it does not go out from the warehouse but directly from location A to location B. Only solution right now is, as Ciaran suggested, go into the warehouse module and book the equipment on project A back to the warehouse and next book the equipment on project B out to location.

    We are currently working on the new App which contains a mobile warehouse module as well. This will allow scanning as well as manual booking directly on location. This will add the option to book items back and directly out on the next project from location on a cellphone.

    0
    Comment actions Permalink
  • We solved it the following way:

    We create accommodations for the time, both Projects overlap. The supplier is the old project and the location of the new project. That way we have all the information needed to make a good transfer, even with scans and routes. 

    Problems: The Material exists for the time of Transfer more often, since technically you book new materials. That is ok in that way, that your timeline shows all accommodations.

    0
    Comment actions Permalink
  • Four years later, I have run into a similar situation and am wondering if anyone found a better solution for this.

    In my case, I have two projects, already underway, that are happening for the same client, in the same space. At the conclusion of the two projects, the equipment for both will then immediately be used on a third project by that same client in the same space, as well as additional equipment. Since nothing is coming back to the warehouse, I need to transfer all the equipment directly to the new project, but duplicating both events and merging them isn't an option that I'm aware of, and manually recreating the equipment list will be time-consuming.

    Is there a simple "transfer" function available yet, or should I just accept that I will need to print out a packing list for each project and manually enter all the equipment into the new project, and then manually "return" and "send to location" all of the equipment that never left?